Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1536693.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,266.00
Current Penalty: $3,949.50
Issuance Date: 09/30/2021
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/27/2021
Gravity: 1
Report ID: 0316700
Contest Date:
Final Order: 10/12/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/12/2021 | $3,949.50 | 10/27/2021 | Serious | |
| Penalty | Z: Issued | 09/30/2021 | $5,266.00 | 10/27/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: (a) Bally Ribbon, Incorporated - There was a metallic outlet box in the Block Machine Area sitting on a cardboard box. This type of electrical box is listed and labeled to be attached to the structure and could create a shock hazard to the employees, on or about August 12, 2021. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate