Violation Detail
Standard Cited: 19260451 F06 General requirements.
This violation item has been deleted.
Inspection Nr: 1535725.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/14/2021
Initial Penalty: $4,096.00
Current Penalty: $0.00
Issuance Date: 10/07/2021
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 10/19/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/19/2021 | $0.00 | 10/14/2021 | Serious | |
Penalty | Z: Issued | 10/07/2021 | $4,096.00 | 10/14/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6):Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). a) On or about June 7, 2021, employees applied waterproofing to the exterior of a building from a SkyPower 450AJ aerial lift basket that was within 10 feet of an energized power line.