Violation Detail
Standard Cited: 19100119 F01 I G Process safety management of highly hazardous chemicals.
Inspection Nr: 1529953.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $13,000.00
Issuance Date: 10/04/2021
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 12/15/2021
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 11/30/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/30/2021 | $13,000.00 | 12/15/2021 | Serious | |
Penalty | Z: Issued | 10/04/2021 | $13,653.00 | 11/22/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(f)(1)(i)(G): Employer did not implement written operating procedures that provide clear instructions for safely conducting Startup Procedure following a turn around. On or about May 4, 2021, in the HF Alkylation 3 Unit, the employer did not ensure that a P&ID walk down or pressure leak test was performed as part of its return to service process.