Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1529705.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $30,037.00
Current Penalty: $18,022.00
Issuance Date: 10/20/2021
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0418600
Contest Date: 11/16/2021
Final Order: 09/14/2022
Related Event Code (REC): R
Emphasis:
Substance: 0372
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 09/14/2022 | $18,022.00 | Serious | ||
| Penalty | C: Contested | 12/06/2021 | $30,037.00 | Repeat | ||
| Penalty | Z: Issued | 10/20/2021 | $30,037.00 | Repeat |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures a) BPA Unit PSM covered process area: On or about, May 3, 2021, and at times prior to, the employer failed to verify that BPA Formulation Pump L3P1090 had been isolated from all active energy systems prior to permitting employees to perform a leak test upon BPA Formulation Pump L3P1090 exposing employees to chemical burn hazards.