Violation Detail
Standard Cited: 19260651 J01 Specific Excavation Requirements.
Inspection Nr: 1524134.015
Citation: 01001
Citation Type: Serious
Abatement Date: 09/07/2021 2
Initial Penalty: $3,901.00
Current Penalty: $1,838.00
Issuance Date: 08/26/2021
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 09/21/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/21/2021 | $1,838.00 | 09/07/2021 | Serious | |
Penalty | Z: Issued | 08/26/2021 | $3,901.00 | 09/07/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(j)(1): Adequate protection was not provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face: On or about March 31, 2021, employees were exposed to struck-by hazards because there was nothing to prevent excavated and loose material from falling into the excavation.