Violation Detail
Standard Cited: 19100219 C03 Mechanical power-transmission apparatus.
Inspection Nr: 1519980.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,653.00
Current Penalty: $6,840.00
Issuance Date: 08/26/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0418600
Contest Date:
Final Order: 09/08/2021
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/08/2021 | $6,840.00 | Serious | ||
Penalty | Z: Issued | 08/26/2021 | $13,653.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.219(c)(3):Guarding vertical and inclined shafting. Vertical and inclined shafting seven (7) feet or less from floor or working platform, excepting maintenance runways, shall be enclosed with a stationary casing in accordance with requirements of paragraphs (m) and (o) of this section: a) Dapek line #3; On or about March 9, 2021 and at times prior, the employer failed to ensure an inclined vertical shaft was protected by stationary guarding which exposed employees to caught-in hazards.