Violation Detail

Standard Cited: 19260451 B01 General requirements.

Inspection Nr: 1518197.015

Citation: 01001

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $4,096.00

Current Penalty: $4,096.00

Issuance Date: 08/24/2021

Nr Instances: 1

Nr Exposed: 2

Abatement Date: 09/20/2021

Gravity: 10

Report ID: 0420600

Contest Date:

Final Order: 11/18/2021

Related Event Code (REC): A;R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty Z: Issued 08/24/2021 $4,096.00 09/20/2021 Serious  

Text For Citation: 01 Item/Group: 001 Hazard:

29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) (a) Building 5 (500): On or about March 2, 2021, the working platform was not fully planked where an arrangement of six 2" x 6 " wooden planks were used as the working platform to hang drywall in an elevator shaft that was 9 ft long by 7 ft-7in wide, exposing employees to a 30 ft-9in fall hazard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.