Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1514803.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Solicitor Advised
Initial Penalty: $5,792.00
Current Penalty: $5,792.00
Issuance Date: 08/09/2021
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 09/24/2021
Gravity: 1
Report ID: 0316700
Contest Date:
Final Order: 09/02/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 08/09/2021 | $5,792.00 | 09/24/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii):The employer did not certify that the periodic inspections have been performed: a) BIRDSBORO KOSHER FARMS FACILITY - The employer did not ensure that equipment including but not limited to; the Risco stuffer (grinding room), Grinder D225A (Second processing room) and HiTec Linkwell machine (RTE raw) did not have the required periodic inspection certification for the calendar year 2020, exposing employees to caught in, struck by and electrical hazards, on or about February 10, 2021. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written record
Translate