Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1513451.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $10,513.00
Current Penalty: $5,000.00
Issuance Date: 08/03/2021
Nr Instances: 1
Nr Exposed: 30
Abatement Date:
Gravity: 10
Report ID: 0214500
Contest Date: 11/30/2021
Final Order: 10/20/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 10/20/2022 | $5,000.00 | Serious | ||
Penalty | C: Contested | 12/02/2021 | $10,513.00 | Serious | ||
Penalty | Z: Issued | 08/03/2021 | $10,513.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3):Exit routes were not free and unobstructed. Materials or equipment were placed, either permanently or temporarily, within the exit route. a) Rear Exterior of Building: An exit door located behind the L2 room was blocked with a garbage dumpster, on or about 3/3/21.