Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
This violation item has been deleted.
Inspection Nr: 1506169.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $4,096.00
Current Penalty: $0.00
Issuance Date: 05/17/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/02/2021
Gravity: 10
Report ID: 0522000
Contest Date: 06/15/2021
Final Order: 03/07/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/07/2022 | $0.00 | 07/02/2021 | Serious | |
| Penalty | C: Contested | 06/17/2021 | $4,096.00 | 07/02/2021 | Serious | |
| Penalty | Z: Issued | 05/17/2021 | $4,096.00 | 07/02/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees exposed to the collapse of buildings: a.) On or before December 9, 2020, located at 14869 U.S. Highway 52, Manchester, OH 45144, the employer did not ensure the cutting operations in preparation for explosive demolition were directed by a structural engineer or competent person qualified to direct the removal of structural elements, exposing employees working within and around the structure to crushing/struck-by hazards. Among other methods, one feasible and acceptable method to correct this hazard includes, but is not limited to the following: Compliance with the National Demolition Association Standard 11.0 - Safe Blasting Procedures, Blasting Survey Section (Page 182), which gives guidance for the preparation of a structure for demolition as follows: The use of explosives to demolish entire buildings should be done by specialty contractors. The preparation of a structure for demolition by explosives may require the removal of structural columns, beams or other building components. This work should be directed by a structural engineer or a competent person qualified to direct the removal of these structural elements. Extreme caution should be taken during this preparatory work to prevent the weakening and premature collapse of the structure.