Violation Detail
Standard Cited: 19260552 A01 Material hoists, personnel hoists, and elevators.
Inspection Nr: 1505232.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,096.00
Current Penalty: $4,096.00
Issuance Date: 03/09/2021
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 04/05/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/09/2021 | $4,096.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.552(a)(1): 29 CFR 1926.552(a)(1): The employer did not comply with the manufacturer's specifications and limitations applicable to the operation of all hoists and elevators. Location: site On or about 12/7/20, the employer did not ensure employees were following the manufactures limitations while using a RGC PRO200 material hoist by allowing the employees to use he hoist as a ladder to access a three story roof.