Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1504909.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,803.00
Current Penalty: $3,771.95
Issuance Date: 05/18/2021
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 06/14/2021
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 06/14/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/14/2021 | $3,771.95 | 06/14/2021 | Serious | |
| Penalty | Z: Issued | 05/18/2021 | $5,803.00 | 06/14/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employees were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: On or about 12/3/2020, at the Commerce, Georgia facility, employees working in the facility were not able to open the rear exit route door from the inside. The exit door was equipped with a dead bolt lock.
Translate