Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 1501569.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,728.00
Current Penalty: $0.00
Issuance Date: 03/30/2021
Nr Instances: 1
Nr Exposed: 16
Abatement Date: 04/05/2021
Gravity: 5
Report ID: 0626600
Contest Date:
Final Order: 05/03/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/03/2021 | $0.00 | 04/05/2021 | Serious | |
Penalty | Z: Issued | 03/30/2021 | $10,728.00 | 04/05/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1):Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: On or about November 9, 2020 employees were not able to open the storage room exit route door from the inside at all times without keys, tools or special knowledge.