Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1500772.015
Citation: 01001
Citation Type: Willful
Abatement Date: 05/04/2021 4
Initial Penalty: $94,432.80
Current Penalty: $94,432.80
Issuance Date: 04/13/2021
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0653510
Contest Date:
Final Order: 05/04/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/13/2021 | $94,432.80 | 05/04/2021 | Willful |