Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1495961.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $12,723.00
Current Penalty: $12,723.00
Issuance Date: 12/29/2020
Nr Instances: 12
Nr Exposed: 6
Abatement Date:
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 01/26/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/26/2021 | $12,723.00 | Serious | ||
Penalty | Z: Issued | 12/29/2020 | $12,723.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws. By the VT1 main crusher: On or about 10/06/2020, adequate strain relief was not provided on electrical connections at various points of the main crusher. Electrical tape was used in some of the connections while others the had the inner sheaths exposed, thus exposing employees who frequent the area to electrical hazards should the wiring be damaged or ripped out.