Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1495467.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,470.00
Current Penalty: $8,000.00
Issuance Date: 12/10/2020
Nr Instances: 1
Nr Exposed: 16
Abatement Date: 03/01/2021
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 01/06/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/06/2021 | $8,000.00 | 03/01/2021 | Serious | |
Penalty | Z: Issued | 12/10/2020 | $11,470.00 | 01/14/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i):Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) Jesgel 850 ton injection molding machine (#EW1858): On or about Sept 24, 2020, the employer did not insure lockout procedures were developed, documented and utilized by employee(s) when performing servicing, maintenance and set-up of the machine. The machine was not deenergized while employee(s) conducted die and raw material changes, exposing the employee(s) to ingoing nip point, crushing hazard and amputation injury.