Violation Detail
Standard Cited: 19260651 J02 Specific Excavation Requirements.
Inspection Nr: 1494461.015
Citation: 01001
Citation Type: Serious
Abatement Date: 03/31/2021 2
Initial Penalty: $3,511.00
Current Penalty: $2,458.00
Issuance Date: 03/23/2021
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0523300
Contest Date:
Final Order: 04/15/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/15/2021 | $2,458.00 | 03/31/2021 | Serious | |
Penalty | Z: Issued | 03/23/2021 | $3,511.00 | 03/31/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(j)(2):Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary: On or about September 25, 2020, excavated materials including soil and pieces of concrete and asphalt were within 2 feet from the edge of the North and East sides of the excavation. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).