Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1494404.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,511.00
Current Penalty: $3,511.00
Issuance Date: 03/12/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0214500
Contest Date:
Final Order: 04/12/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/12/2021 | $3,511.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form or scrap lumber with protruding nails was not kept clear from work a. Building Exterior Grounds: An employee engaged in labor activities was exposed to puncture hazards as wood and with protruding nails was allowed to accumulate and had not been removed from the site. Condition noted on or about 09/17/2020