Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1487079.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,145.00
Current Penalty: $12,145.00
Issuance Date: 01/06/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/13/2021
Gravity: 10
Report ID: 0214700
Contest Date:
Final Order: 02/26/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/26/2021 | $12,145.00 | 01/13/2021 | Other | |
| Penalty | Z: Issued | 01/06/2021 | $12,145.00 | 01/13/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): The point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle. a) Worksite, machine shop, press brake #4: On or about August 3, 2020, an employee was exposed to amputations while operating an Amada HFBO Press Brake (S/N 100 30 R981122) that did not have a point of operation guard. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.