Standard Cited: 19100179 N02 III Overhead and gantry cranes.
Inspection Nr: 1484974.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $13,494.00
Current Penalty: $10,120.00
Issuance Date: 11/24/2020
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC): A
Gravity: 10
Report ID: 0418400
Contest Date:
Final Order: 12/23/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/23/2020 | $10,120.00 | Serious | ||
Penalty | Z: Issued | 11/24/2020 | $13,494.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.179(n)(2)(iii): Care was not taken to make certain that the sling clears all obstacles. a). Spinner Area - On or about and at times prior to July 22, 2020, the employer did not ensure that the Certex chain sling hooks cleared all obstacles during crane lifting operations of spinner machine wheels, exposing employees to a struck-by hazard.