Violation Detail
Standard Cited: 19260056 A Illumination.
Inspection Nr: 1481284.015
Citation: 01001
Citation Type: Serious
Abatement Date: 11/09/2020 2
Initial Penalty: $2,313.00
Current Penalty: $1,267.80
Issuance Date: 10/28/2020
Nr Instances: 3
Nr Exposed: 7
Related Event Code (REC):
Gravity: 1
Report ID: 0215800
Contest Date:
Final Order: 03/16/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/16/2021 | $1,267.80 | 11/09/2020 | Serious | |
Penalty | Z: Issued | 10/28/2020 | $2,313.00 | 11/09/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.56(a): While work was in progress, construction areas, ramps, runways, corridors, offices, shops or storage areas were not lighted to the minimum illumination intensities as listed in Table D-3 of 29 CFR 1926.56: a) At the jobsite, inside building #1, on or about 6/30/20: Workers were transiting through the stairwell and hallways where no lighting was provided and readings were measured between .01 and .06 lumens and was occasionally too dark to read the device. b) At the jobsite, inside building #2, on the first floor, on or about 6/30/20: Workers were transiting through and working inside areas where no lighting was provided and readings were measured between .01 and .06 lumens and was occasionally too dark to read the device. c) At the jobsite, inside building #3, on the first floor and second floor,on or about 6/30/20: Workers were transiting through a hallway where no lighting was provided and readings were measured between .01 and .05 lumens.