Violation Detail
Standard Cited: 19260453 B02 VI Aerial lifts.
Inspection Nr: 1476796.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,398.00
Current Penalty: $4,318.40
Issuance Date: 11/06/2020
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 12/04/2020
Gravity: 10
Report ID: 0627100
Contest Date: 12/08/2020
Final Order: 03/01/2021
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/01/2021 | $4,318.40 | 12/04/2020 | Serious | |
| Penalty | C: Contested | 12/09/2020 | $5,398.00 | 12/04/2020 | Serious | |
| Penalty | Z: Issued | 11/06/2020 | $5,398.00 | 12/04/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.453(b)(2)(vi): Boom and basket load limits specified by the manufacturer were exceeded: On or about May 7 2020, employees were working in the baskets of articulated boom lifts where the baskets' rated weight tolerance was exceeded by personnel and a combination of equipment including, but not limited to tools, materials, and welders. The rated weight capacity of the baskets of the articulated boom lifts in use was 500 lbs. and the average weight in and attached to the basket exceeded this by approximately 30-40 lbs.
Translate