Violation Detail
Standard Cited: 19260752 D Site layout, site-specific erection plan and construction sequence.
Inspection Nr: 1475408.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,446.00
Current Penalty: $7,000.00
Issuance Date: 11/10/2020
Nr Instances: 1
Nr Exposed: 9
Abatement Date: 12/30/2020
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 12/09/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/09/2020 | $7,000.00 | 12/30/2020 | Serious | |
| Penalty | Z: Issued | 11/10/2020 | $9,446.00 | 12/30/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.752(d): Pre-planning of overhead hoisting operations. All hoisting operations in steel erection were not pre-planned to ensure that the requirements of 1926.753(d) are met. On or about 05/12/2020 workers at the PDQ, INC. steel erection jobsite were exposed to overhead hazards during hoisting operations. The General Contractor did not verify subcontractor conducted pre-planning prior to conducting overhead hoisting operations.