Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1474894.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,494.00
Current Penalty: $8,096.40
Issuance Date: 06/10/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 07/06/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/06/2020 | $8,096.40 | Serious | ||
| Penalty | Z: Issued | 06/10/2020 | $13,494.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): (a) On or about May 7, 2020 an insulation lamination machine was being operated with its point of operation unguarded in that two sets of two-handed controls were bypassed exposing employees to a caught in hazard.
Translate