Violation Detail
Standard Cited: 19100179 G03 V Overhead and gantry cranes.
Inspection Nr: 1469493.015
Citation: 01001
Citation Type: Other
Abatement Date: 09/17/2020 2
Initial Penalty: $9,446.00
Current Penalty: $500.00
Issuance Date: 09/04/2020
Nr Instances: 5
Nr Exposed: 5
Related Event Code (REC): A
Gravity: 10
Report ID: 0523400
Contest Date: 09/29/2020
Final Order: 06/02/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/02/2021 | $500.00 | 09/17/2020 | Other | |
Penalty | C: Contested | 09/29/2020 | $9,446.00 | 09/17/2020 | Serious | |
Penalty | Z: Issued | 09/04/2020 | $9,446.00 | 09/17/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.179(g)(3)(v) The control for the bridge and trolley travel shall be so located that the operator can readily face the direction of travel: (a) �Prior to March 13, 2020, the employer failed to provide effective training to all operators of overhead cranes on the proper storage of radio remote controls, creating the potential for the crane to be inadvertently activated while the employee is not facing the direction of travel