Violation Detail
Standard Cited: 19101001 J05 I Asbestos.
Inspection Nr: 1467755.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/19/2020 7
Initial Penalty: $8,193.00
Current Penalty: $8,193.00
Issuance Date: 05/26/2020
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC): C
Gravity: 5
Report ID: 0316700
Contest Date: 06/22/2020
Final Order:
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 06/23/2020 | $8,193.00 | 06/19/2020 | Serious | |
Penalty | Z: Issued | 05/26/2020 | $8,193.00 | 06/19/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.1001(j)(5)(i): The employer did not affix signs or labels to previously installed ACM that they had identified so that employees would be notified of what materials contain ACM and/or PACM. (a) Metropolitan Edison, Incorporated - South Lebanon Sub-Station - The asbestos floor panels, containing fifteen (15) percent chrysotile, were not labeled, on or about March 4, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.