Violation Detail
Standard Cited: 19260754 E05 I Structural steel assembly.
Inspection Nr: 1462994.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,390.00
Current Penalty: $8,905.80
Issuance Date: 06/19/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/16/2020
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 07/06/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/06/2020 | $8,905.80 | 07/16/2020 | Serious | |
| Penalty | Z: Issued | 06/19/2020 | $10,390.00 | 07/16/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.754(e)(5)(i): Metal decking was not laid tightly and immediately secured upon placement to prevent accidental movement or displacement: On February 11, 2020 and times prior thereto, metal mesh panels used as roof decking were not secured immediately after placement and shifted while an employee was walking across them to retrieve tools, exposing employees to the hazard of a fall from height.
Translate