Violation Detail
Standard Cited: 19100147 C04 II C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1462958.015
Citation: 01001
Citation Type: Other
Abatement Date: 03/20/2020 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/27/2020
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 03/25/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/27/2020 | $0.00 | 03/20/2020 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(C): The energy control procedure did not clearly and specifically outline the steps for placement, removal and transfer of lockout devices or tagout devices and the responsibility for them: (a) #3 Board Mill Kiln - On or about February 13, 2020 the procedures for removing kiln plug ups did not clearly outline the steps for the placement and removal of lockout or tagout devices on the circulating fans.