Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1460661.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,639.00
Current Penalty: $5,783.40
Issuance Date: 04/09/2020
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 05/05/2020
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 05/05/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/05/2020 | $5,783.40 | 05/05/2020 | Other | |
| Penalty | Z: Issued | 04/09/2020 | $9,639.00 | 05/05/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) Serco Chesapeake Facility: On about 02/04/2020, the Bai Leigh horizontal band-saw serial number 7102226 model number BS350SA used to cut various pipes and plates, the unused portion of the sawblade was unguarded, as a result employees were exposed to a possible amputation or severe laceration. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate