Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1459359.015
Citation: 01001
Citation Type: Willful
Abatement Date: 09/29/2020
Initial Penalty: $48,578.00
Current Penalty: $48,578.00
Issuance Date: 09/23/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0953220
Contest Date: 10/23/2020
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 10/23/2020 | $48,578.00 | 09/29/2020 | Willful | |
Penalty | Z: Issued | 09/23/2020 | $48,578.00 | 09/29/2020 | Willful |