Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1457340.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $12,145.00
Current Penalty: $0.00
Issuance Date: 07/10/2020
Nr Instances: 1
Nr Exposed: 14
Abatement Date:
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 08/04/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/04/2020 | $0.00 | Serious | ||
Penalty | Z: Issued | 07/10/2020 | $12,145.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3): Exit routes were not kept free and unobstructed. Materials or equipment were placed, either permanently or temporarily, within the exit route: a. Main Assembly Bay - On or about January 21, 2020, the emergency exit route was not maintained to ensure easy access, in that the exit route was only 21 inches wide.