Violation Detail
Standard Cited: 19260451 C02 IV General requirements.
Inspection Nr: 1457252.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,446.00
Current Penalty: $9,446.00
Issuance Date: 06/03/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 06/30/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 06/03/2020 | $9,446.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(2)(iv): Front-end loaders and similar pieces of equipment were used to support scaffold platforms when they were not specifically designed by the manufacturer for such use: a. On or about January 21, 2020, at the Lake Crossing Apartments in Gainesville, at Building K, the JCB Model 510-56 Telescopic Handler was used to support scaffold platform that was not specifically designed by the manufacturer for such use, exposing employees to a 30 foot fall hazard.
Translate