Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 1456195.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $8,096.40
Issuance Date: 05/29/2020
Nr Instances: 3
Nr Exposed: 3
Abatement Date: 06/15/2020
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 06/22/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/22/2020 | $8,096.40 | 06/15/2020 | Serious | |
Penalty | Z: Issued | 05/29/2020 | $13,494.00 | 06/15/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(2): The floor of a workroom was not maintained in a clean condition. a) On or about January 14, 2020 in the Pallet Making Area, the employee were utilizing a Dewalt DW 713 10" Compound Mitre Saw (#258962) to cut wooden planks for wooden pallets allowing a build-up of combustible saw dust. b) On or about January 14, 2020 in the Banding Area, employees were utilizing an electrical outlet with an accumulation of combustible saw-dust. c) On or about January 14, 2020 in the Fabrication Welding Area, employees were utilizing a sanding belt machine to smooth out burrs and/or rough spots on aluminum products where an accumulation of aluminum dust was building up.