Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1454008.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $12,145.00
Current Penalty: $8,501.50
Issuance Date: 05/21/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/03/2020
Gravity: 10
Report ID: 0317000
Contest Date: 06/15/2020
Final Order: 07/02/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 07/02/2021 | $8,501.50 | 06/03/2020 | Serious | |
Penalty | C: Contested | 06/15/2020 | $12,145.00 | 06/03/2020 | Serious | |
Penalty | Z: Issued | 05/21/2020 | $12,145.00 | 06/03/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout is used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. a) Jobsite: 16 Anderson Rd, Parker Ford, PA, manufacturing plant, dry side - As the controlling employer, employees servicing the Dry Side machine were exposed to struck-by and entanglement hazards. The employer did not conduct periodic inspections of the energy control procedures at least annually with each employee who clears jams to ensure that they properly implement lockout for the control of hazardous energy. Noted on 12/13/19