Violation Detail
Standard Cited: 19260761 C03 Training.
Inspection Nr: 1446337.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,446.00
Current Penalty: $9,446.00
Issuance Date: 02/11/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/20/2020
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 03/03/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/03/2020 | $9,446.00 | 02/20/2020 | Serious | |
| Penalty | Z: Issued | 02/11/2020 | $9,446.00 | 02/20/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.761(c)(3): Controlled Decking Zone Procedures. Where CDZs are being used, the employer shall assure that each employee has been provided training in the following areas: On or about November 19, 2019 employee fell greater than 6 feet off the unprotected side of a low slope roof.