Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1444912.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,711.00
Current Penalty: $7,711.00
Issuance Date: 05/05/2020
Nr Instances: 2
Nr Exposed: 8
Abatement Date: 06/01/2020
Gravity:
Report ID: 0213900
Contest Date:
Final Order: 05/21/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/21/2020 | $7,711.00 | 06/01/2020 | Other | |
| Penalty | Z: Issued | 05/05/2020 | $7,711.00 | 06/01/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft and were not protected by nonrotating caps or sleeves: a) Production, Artesian Bread Side of facility, Line 2 between oven and vision system: Unguarded projecting shaft ends projected more than one half the diameter of the shaft, the diameter measured approximately 3/4 of an inch and protruded approximately 1 1/4 inches on or about 11/14/2019. b) Production, Artesian Bread Side of facility, End of Line 4: Unguarded projecting shaft ends projected more than one half the diameter of the shaft, diameter measured approximately 1 inch and protruded approximately 1 3/8 inches the second shaft diameter measured approximately 1 1/4 inch protruded approximately 1 1/4 inches, on or about 11/14/2019. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.