Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1444333.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $3,856.00
Current Penalty: $2,313.60
Issuance Date: 03/03/2020
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0419700
Contest Date:
Final Order: 03/24/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/24/2020 | $2,313.60 | Serious | ||
Penalty | Z: Issued | 03/03/2020 | $3,856.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about November 13, 2019, employees were using a partially planked scaffold to access the trusses where they were laying decking, exposing themselves to a 10.7-foot fall hazard.