Violation Detail
Standard Cited: 19100268 D01 Telecommunications.
Inspection Nr: 1442519.015
Citation: 01001
Citation Type: Serious
Abatement Date: 05/12/2020 2
Initial Penalty: $13,494.00
Current Penalty: $9,445.80
Issuance Date: 04/07/2020
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 04/28/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/28/2020 | $9,445.80 | 05/12/2020 | Serious | |
Penalty | Z: Issued | 04/07/2020 | $13,494.00 | 05/12/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.268(d)(1): Before work was begun in the vicinity of vehicular or pedestrian traffic which could endanger employees, warning signs, flags, barriers, and/or other traffic control devices were not placed conspicuously to alert and channel approaching traffic: Or, in the alternative; 29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): As a result, the remaining applicable energy control elements, involving machine isolation [1910.147(d)(3)], lockout/tagout device application [1910.147(d)(4)], dissipation of residual energy [1910(d)(5)(i)], and verification of isolation [1910.147(d)(6)] were not implemented to protect employees from machine hazards. a) On or about 10/28/2019 an employee was injured when the JLG aerial work platform that he was working in was knocked over when a garage door was opened remotely with the employee coming out of the platform on the way down.