Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1441592.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,892.00
Current Penalty: $400.00
Issuance Date: 01/21/2020
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/28/2020
Gravity: 5
Report ID: 0214700
Contest Date: 02/13/2020
Final Order: 08/21/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/21/2020 | $400.00 | 01/28/2020 | Serious | |
Penalty | C: Contested | 03/02/2020 | $2,892.00 | 01/28/2020 | Serious | |
Penalty | Z: Issued | 01/21/2020 | $2,892.00 | 01/28/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a. Establishment: Employees performing job duties in the tanning salon by the laundry room wing were exposed to fire hazards due to a locked emergency door exit. Employees needed a key to open the door from the inside; on or about 10/29/2019. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.