Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1439020.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,419.00
Current Penalty: $6,251.40
Issuance Date: 12/09/2019
Nr Instances: 1
Nr Exposed: 21
Abatement Date: 01/06/2020
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 01/03/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/03/2020 | $6,251.40 | 01/06/2020 | Serious | |
| Penalty | Z: Issued | 12/09/2019 | $10,419.00 | 01/06/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about October 12, 2019, the energy control procedures for a Geyer six stem #2 cartridge filler machine were not developed, documented, and utilized for the control of potentially hazardous energy. Operators and maintenance employees working and un-jamming caps at the cap press area of the machine were exposed to an amputation hazard.