Violation Detail
Standard Cited: 19100036 D02 Design and construction requirements for exit routes.
Inspection Nr: 1436287.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $8,354.00
Current Penalty: $1,000.00
Issuance Date: 02/14/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/21/2020
Gravity:
Report ID: 0953220
Contest Date:
Final Order: 03/12/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/12/2020 | $1,000.00 | 02/21/2020 | Other | |
Penalty | Z: Issued | 02/14/2020 | $8,354.00 | 02/21/2020 | Serious |