Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1430748.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,446.00
Current Penalty: $5,398.00
Issuance Date: 02/13/2020
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 03/04/2020
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 03/12/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/12/2020 | $5,398.00 | 03/04/2020 | Serious | |
Penalty | Z: Issued | 02/13/2020 | $9,446.00 | 03/04/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of the scaffold was not fully planked or decked between the front uprights and the guardrail supports. a) On or about September 11, 2019, at the northeast side of the construction site, employees utilized a scaffolding approximately 15-feet above the ground that was not fully planked or decked while performing masonry work.