Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1424569.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,634.00
Current Penalty: $2,800.00
Issuance Date: 02/06/2020
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 04/15/2021
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 03/03/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 02/18/2021 | $2,800.00 | 04/15/2021 | Serious | |
Penalty | I: Informal Settlement | 03/03/2020 | $2,800.00 | 11/03/2020 | Serious | |
Penalty | Z: Issued | 02/06/2020 | $7,634.00 | 03/12/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(5)(i): The average air speed over the open face of the paint spray booth was less than 100 linear feet per minute. Collision shop floor, 99-105 Andover Street, Danvers, MA On or about 8/20/19, booths used for the spraying of paint onto vehicles did not maintain an average air speed of 100 feet per minute. a) The prep deck had air speeds ranging from 21 to 80 feet per minute. b) Two bays of the spray booth had air speeds ranging from 55 to 105 feet per minute.