Standard Cited: 19260651 J01 Specific Excavation Requirements.
This violation item has been deleted.
Inspection Nr: 1423254.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $10,210.00
Current Penalty: $0.00
Issuance Date: 10/25/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 11/15/2019
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2019 | $0.00 | Serious | ||
Penalty | Z: Issued | 10/25/2019 | $10,210.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(j)(1): Adequate protection was not provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face: (a) Location - 12 Lopez Street, Cambridge, MA On or about 08/14/2019, employees were exposed to loose soil while performing pipe work in a trench 9 feet in depth where the protective system did not extend to the employees work area.