Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1422802.015
Citation: 01001
Citation Type: Serious
Abatement Date: 11/20/2019 2
Initial Penalty: $3,978.00
Current Penalty: $3,978.00
Issuance Date: 10/02/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 11/26/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 10/02/2019 | $3,978.00 | 11/20/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer than 10 feet to exposed and energized power lines. a) On or about July 29, 2019: At the site, conductive roof panels being installed from scissor lifts were moved closer than 10 feet to an energized 13,200 volt power line.