Violation Detail
Standard Cited: 19260600 A06 I Equipment.
Inspection Nr: 1422050.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,978.00
Current Penalty: $3,978.00
Issuance Date: 08/21/2019
Nr Instances: 1
Nr Exposed: 6
Abatement Date:
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 10/08/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 08/21/2019 | $3,978.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.600(a)(6)(i): For lines rated 50 kV or below, minimum clearance between the lines and any part of the crane or load was not 10 feet; a. On August 8, 2019, the boom of the pump truck was positioned above the overhead power line and eventually got within 10 feet and made contact with the power line, exposing employees to a 13,200 volt electrical hazard.