Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1421304.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,603.00
Current Penalty: $7,422.00
Issuance Date: 01/30/2020
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/09/2020
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 02/25/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/25/2020 | $7,422.00 | 03/09/2020 | Serious | |
| Penalty | Z: Issued | 01/30/2020 | $10,603.00 | 03/09/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. Itasca, Illinois plant, Multivac 3 IP03 sandwich pouching line: on or about August 4, 2019, inspections of the control of hazardous energy (lockout) procedures and reviews with authorized employees were not conducted at least annually to identify and correct any deviations or procedural inadequacies. Maintenance personnel assigned to perform setup activities had their fingers exposed to moving machine parts. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).