Violation Detail
Standard Cited: 19100147 C07 III B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1414780.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $10,608.00
Issuance Date: 11/15/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/27/2019
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 11/26/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/26/2019 | $10,608.00 | 11/27/2019 | Serious | |
| Penalty | Z: Issued | 11/15/2019 | $13,260.00 | 11/27/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(7)(iii)(B): Retraining is to be conducted when the employer has reason to believe that there are inadequacies in the employee's knowledge or use of energy control procedures. On or about July 10, 2019, in Studmill North Cutter Head area; the employer did not ensure that Lockout/Tagout (LOTO) re-training was given to employee(s) that indicated inadequacies in their knowledge or use of the LOTO energy control procedures.
Translate