Violation Detail
Standard Cited: 19260405 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1409959.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,842.00
Current Penalty: $2,842.00
Issuance Date: 10/31/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 12/09/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 10/31/2019 | $2,842.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.405(g)(2)(iii): Splices. Flexible cords shall be used only in continuous lengths without splice or tap. Hard service flexible cords No. 12 or larger may be repaired if spliced so that the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced. A) 325 Chestnut St, Union, NJ: Flexible cords were not used only in continuous lengths without splice or tap on extension cord being used with hand power tools. Condition observed on or about May 31, 2019.