Violation Detail
Standard Cited: 19261412 J
This violation item has been deleted.
Inspection Nr: 1408500.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $13,260.00
Current Penalty: $0.00
Issuance Date: 12/06/2019
Nr Instances: 2
Nr Exposed: 20
Abatement Date: 01/03/2020
Gravity: 10
Report ID: 0626300
Contest Date: 12/23/2019
Final Order: 08/11/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/11/2021 | $0.00 | 01/03/2020 | Serious | |
Penalty | C: Contested | 12/26/2019 | $13,260.00 | 01/03/2020 | Serious | |
Penalty | Z: Issued | 12/06/2019 | $13,260.00 | 01/03/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.1412(j): Any part of a manufacturer's procedures regarding inspections that relate to safe operation (such as to a safety device or operational aid, critical part of a control system, power plant, braking system, load-sustaining structural components, load hook, or in-use operating mechanism) that is more comprehensive or has a more frequent schedule of inspection than the requirements of this section must be followed. a) On or about June 8, 2019, and times prior to, the employer did not follow the manufacturers recommendations, when erecting and inspecting the Peiner tower crane, by removing bolts that showed rust, exposing employees to a struck-by hazard. b) On or about June 8, 2019, and times prior to, the employer did not follow the manufacturers recommendations, when erecting and inspecting the Peiner tower crane, by addressing surface corrosion of structural tower members, exposing employees to a struck-by hazard.